A track record built on real work — day-in, day-out splicing and testing for utilities and carriers, and a specialized subsea practice that goes back to the 1990s.

Featured case study

San Juan ↔ Lopez Submarine Cable

Pirelli install (1999) · CenturyLink emergency restoration (2013)

Scope

The San Juan ↔ Lopez submarine cable was originally installed by Mark Jacobson in 1999 during his 13-year tenure with Pirelli Jacobson Inc. In 2013, when the cable failed, CenturyLink engaged Waveguide Networks to lead the emergency restoration on a cable Mark had personally laid 14 years earlier.

Challenge

San Juan ↔ Lopez transits some of the most challenging subsea conditions in the Pacific Northwest — tidal currents, marine traffic, and seabed terrain that punishes lesser cable armor. The restoration required precision fusion splicing of submarine fiber under field conditions, coordination with active carrier operations, and the recovery of a specialized subsea splice Mark had engineered during the Pirelli Jacobson era and put back into service on the very cable it was built for.

Outcome

The cable was restored to documented performance. The project also originated Waveguide's partnership with HengTong Cable Group — the custom rock-armor / quad-armor specification that produced a full production cable supply for CenturyLink in 2017 (below) and has continued across the company's submarine power cable work since.

Splicing & Testing

A featured splicing-and-testing case study — the everyday work that keeps utility and carrier networks running — is in preparation.

Submarine Cable — three decades in the Pacific Northwest

Waveguide's subsea practice goes back to the late 1990s and has delivered high-stakes projects across the region and beyond. Each project is a specialized, senior-led engagement.

CenturyLink 2017 — rock-armor submarine cable supply (with HengTong)

Client: CenturyLink · Year: 2017 · Type: Submarine fiber optic cable supply

Scope

Four years after the 2013 emergency restoration, CenturyLink returned to replace the San Juan ↔ Lopez cable outright with the custom rock-armor / quad-armor submarine cable that the 2013 emergency had originated. Waveguide Networks and HengTong Cable Group supplied the replacement cable.

Challenge

Designing, manufacturing, and delivering a custom armor-class submarine cable specification is a multi-year engineering exercise. The armor had to survive the conditions that had taken out the original cable: heavy tidal currents, abrasive seabed, marine vessel activity. The supply contract required tight coordination between Waveguide's specification work and HengTong's factory production and testing.

Outcome

First production deployment of the Waveguide–HengTong rock-armor / quad-armor cable specification, supplied to CenturyLink as a full replacement of the original Pirelli-era cable. The same armor specification has since been deployed on subsequent submarine cable projects.

Furukawa / JF Brennan — San Juan Island cable landing vault

Client: Furukawa, in partnership with JF Brennan / Fuqua Corporation · Type: Cable landing vault engineering + subsea-to-land splice

Scope

For Japanese cable manufacturer Furukawa, working in partnership with JF Brennan and Fuqua Corporation, Waveguide engineered the cable landing vault on San Juan Island and designed a specialized solution for splicing submarine cable fibers to the land-side cable.

Challenge

A submarine-to-land cable transition is one of the most demanding splice environments in fiber: the cable changes mechanical structure, environment, and protection class within a few meters. The vault and the splice solution had to handle that transition reliably for the operational life of the cable.

Outcome

Engineered vault and splice solution delivered — a direct application of Waveguide's everyday splicing engineering at the boundary between subsea and terrestrial infrastructure.

Port of Seattle Terminal 46 — 26.4kV submarine power cable

Client: Port of Seattle · Type: Submarine power cable supply

Scope

Waveguide Networks, in partnership with HengTong Cable Group, supplied a 26.4kV submarine power cable for the Port of Seattle's Terminal 46 infrastructure. The cable was engineered to Port of Seattle specifications and delivered for marine deployment.

Challenge

Port infrastructure requires cable engineered to operate reliably in active marine and industrial environments — vessel traffic, harbor sediment dynamics, and Port-mandated performance specifications. The supply contract required tight coordination between cable fabrication, factory acceptance testing, and delivery logistics into a working port facility.

Outcome

Cable delivered to Port of Seattle for terminal infrastructure deployment.

Snohomish County PUD Hat Island — 12.47kV submarine power cable

Client: Snohomish County PUD District No. 1 · Cable delivery: December 2025 · Installation monitoring: February 2027 · Type: Submarine power cable supply + monitoring

Scope

Waveguide Networks, in partnership with HengTong Cable Group, supplied a 12.47kV submarine power cable for Snohomish County PUD's Hat Island infrastructure (RFP 23-1411-BP). Timothy Mullins performed the final fiber test on the cable before handover to SnoPUD. Waveguide's remaining scope is installation monitoring during the cable's deployment, scheduled for February 2027.

Challenge

Island power cable projects combine medium-voltage submarine cable engineering with the logistical complexity of island-utility procurement. The cable specification, fabrication, and delivery had to align with the PUD's project timeline and the marine installation window in Puget Sound.

Outcome

Cable delivered on schedule in December 2025. Installation monitoring engagement begins February 2027.

St. Thomas → private Caribbean island — subsea fault location

Type: Subsea fault location + repair consulting

Scope

Subsea fault location and repair consulting for the fiber cable serving a private island owner in the U.S. Virgin Islands. The cable was faulted on the shore landing; Waveguide supported fault identification and advised on the repair execution.

Challenge

Shore-landing fault location demands precise OTDR interpretation across submarine and terrestrial cable segments, plus on-site assessment of the landing infrastructure to determine the best repair approach.

Outcome

Fault location and repair consulting delivered to the client.